Program introduction:
The Course will
provide an insight into the benefits of Risk
Based Inspection and the planning of inspection using
risk analysis. It will also clearly outline that the purpose of
Risk Analysis and to assess the consequences and
risks of failure. As such the inspection plan can
then target high-risk equipment and be designed to detect potential
degradation before fitness-for-service can be threatened.
PROGRAM OUTLINES:
-
Introduction to
Risk Based Inspection
-
Background
-
Objectives
-
Equipment Covered
-
Cause of Failure
-
Risk Based
Inspection
-
Process of Risk
Based Inspection
-
Application of
Risk Based Inspection
-
System Definition
-
Drivers Towards
RBI Techniques
-
Summary of Main
Points
-
The Risk based
Inspection Team
-
Composition and
Competencies
-
Role of the
Competent Person
-
Role of the Team
Leader
-
Summary of Main
Points
-
Risk Analysis
Procedures
-
Elements of the
Process
-
Identification of
Accident Scenarios
-
Identification of
Deterioration and Modes of failure
-
Probability of
failure Assessment
-
Determination of
the Form Equipment Failure
-
Risk Ranking and
Categorisation
WHO SHOULD ATTEND?
Planning Engineers responsible for safety of
critical plant site inspections, maintenance engineers and others
involved in industrial risk assessment details
|